Getting a Quote for Asbestos Removal

Getting a Quote for Asbestos Removal
> Make an Enquiry

A clear asbestos removal quote should explain what work is included, how the asbestos will be managed, the expected programme and how the price has been calculated.

The more accurate information you can provide at the outset, the easier it is for a contractor to understand the project and prepare a meaningful quotation. This guide covers what can affect the cost, what information to provide and what to look for when comparing quotes.

To discuss your project with us, call 0800 358 1100.

‍

When Does Asbestos Need to be Removed?

Asbestos-containing materials (ACMs) do not automatically need to be removed. Where they are in good condition and unlikely to be disturbed, they can often remain in place as part of an appropriate asbestos management plan.

Removal may be appropriate where a material cannot reasonably be repaired or protected, is vulnerable to damage or is likely to be disturbed by planned refurbishment or demolition work. HSE guidance sets out repair, sealing, enclosure and removal as possible management options, depending on the condition of the material and the work planned.

The right approach should therefore be based on the ACM, its condition, the proposed work and a suitable risk assessment rather than an assumption that removal is always necessary.

‍

What Affects the Cost of Asbestos Removal?

There is no reliable standard price for asbestos removal. Two projects involving the same type of material can have very different requirements once access, condition and the surrounding site are taken into account.

When preparing an asbestos removal quote, a contractor may need to consider:

  • The asbestos survey information and defined scope of work
  • The type, condition, quantity and location of the ACMs
  • Access, work at height and other site restrictions
  • Whether the work is licensable, notifiable non-licensed work (NNLW) or non-licensed
  • The controls and equipment required
  • Air monitoring or analytical support where needed
  • Waste packaging, transport and disposal arrangements
  • Occupancy, working hours and programme constraints
  • Any reinstatement included within the project

When comparing quotations, make sure contractors are pricing the same written scope. Check what is included, excluded or provisional rather than comparing the headline figure alone.

‍

How Quickly Can I Get an Asbestos Removal Quote?

Timescales depend on the size and complexity of the project and how much information is already available.

For a detailed quotation, HSG227 states that a contractor will almost always need to visit the site to assess the work. The same guidance recommends giving contractors relevant information about the site and any constraints that could affect how the work is carried out or priced.

Providing useful information at the start can help define the work and reduce the risk of the scope changing later. This could include:

  • The proposed scope of work
  • Relevant asbestos survey and register information
  • Plans of the property or affected area
  • Access arrangements
  • Known site hazards and site rules
  • Water, power and welfare arrangements
  • Details of building occupancy and people working nearby
  • Working-hour or programme restrictions
  • Any specific supervision or reporting requirements

If some of this information is not yet available, tell us. We can advise what needs to be established before a firm scope and quotation can be prepared.

‍

What Should an Asbestos Removal Quote Include?

A clear asbestos removal quote should explain what work is included, how the asbestos will be managed, the expected programme and the basis of the price. 

Depending on the project, it should make clear:

  • Which ACMs and areas are included
  • The proposed removal or remediation approach
  • The main controls required for the work
  • Whether the work is licensed, NNLW or non-licensed
  • Who will provide any required air monitoring or clearance testing
  • The anticipated programme and site requirements
  • How asbestos waste will be packaged, transported and disposed of
  • The basis of the price
  • Any exclusions, assumptions or provisional items
  • How unforeseen work will be dealt with

Where licensable asbestos work is required, the removal contractor carrying out that work must hold the appropriate HSE licence. HSE also strongly recommends that the analyst responsible for site-clearance certification is independently sourced and appointed by the building owner or client in control of the premises.

These details make it much easier to compare quotations on a like-for-like basis and understand where responsibilities sit before work starts.

‍

What to Expect During the Asbestos Removal Process

There is no single removal method that applies to every ACM or project. The approach should reflect the material, its condition, the site and the work being carried out.

The risk assessment and plan of work should identify the controls required.

Asbestos work broadly falls into three categories: licensable work, notifiable non-licensed work and non-licensed work. The category depends on factors including the material, its condition, the task and the likely level of exposure.

For example, carefully controlled removal of asbestos cement in reasonable condition can often be non-licensed. If that material is badly damaged or the work will substantially break it up, it may instead be NNLW. Higher-risk work, including work on sprayed coatings, loose-fill insulation, most asbestos insulation and most work involving asbestos insulating board, generally requires an HSE-licensed contractor.

Depending on the project, controls can include:

  • Controlled wetting or other methods to reduce fibre release
  • Segregation of the work area or an enclosure
  • Suitable personal protective equipment and respiratory protective equipment
  • Decontamination and controlled cleaning
  • Air monitoring or clearance testing where required
  • Correct packaging and transfer of asbestos waste

Not every control will be necessary on every project. The requirements should be determined by the risk assessment and plan of work.

Where asbestos fibre concentrations are measured in air, the analytical laboratory must hold the relevant ISO/IEC 17025 accreditation. HSE recognises UKAS as the accreditation body for this work in Great Britain. HSG248 is HSE's authoritative guidance for asbestos analytical procedures.

‍

What Happens to Asbestos Waste?

Asbestos waste needs to be packaged, transported and sent to an appropriate authorised waste facility using the documentation required for the location of the project.

In England, hazardous waste movements require a consignment note, which accompanies the waste until it reaches its destination. Registered waste carriers must take hazardous waste to the destination recorded on the note and that destination must be authorised to receive it.

Requirements differ across the UK, so the arrangements should be confirmed for the country in which the work takes place.

‍

Getting an Asbestos Removal Quote From EMS

We have supported asbestos projects since 2003 and can assist with the different stages involved in planning and completing removal work.

Our own teams carry out non-licensed asbestos removal. Where licensed work is required, we can procure and coordinate an appropriate HSE-licensed contractor. We can also provide wider asbestos consultancy support including surveys, specifications, project management and air testing where these services are needed.

Our wider company credentials include Constructionline and Acclaim, alongside ISO 9001 certification. 

To request an asbestos removal quote, call us on 0800 358 1100 or complete our contact form. If you already have an asbestos survey, plans, photographs or details of the proposed work, having these available will help us understand the project from the outset.

‍